Case Studies
Offsite Manufacturing
As a result of the early engagement with Bluewater Bio we were able to realise efficiencies in terms of the…
Read moreSteel Industry
With careful design and planning the bridge was built in modular format keeping disruption of site operations and loss of…
Read moreRigless Intervention System
Hydraulic Pipework Typical Mast Connection Locking Bolt Crown on Cross Travel Carriage. (Lift Trolley Drive Frame & Winch…
Read moreFarmoor WTW (Thames Water)
Rapid Gravity Filters (RGF’s),Granular Activated Carbon Filters (GAG’s) Refurbishment of existing water treatment plant to up grade a number of…
Read moreStrongford WwTW (Severn Trent)
Approximately 2KM of stainless steel pipework was used to distribute the air under the media. Also in the scope of…
Read moreThe Mersey Valley Processing Centre
The works consisted of:- The installation of large items of kit onto steelwork or prepared plinths, sludge dryers, acid/alkaline scrubbers,…
Read moreThe Sandhill GWE BioGas Plant, Driffield
The works were to process 50,000T of waste per year via a new materials handling system, pasteurisation plant, digestion tanks,…
Read more