Table of Contents
- Structural design and detailed 3d model.
- Manufacture of pipework.
- Manufacture of support framework.
- Assembly, including free issue pumps, blowers and valves.
- Design, fabrication, testing and certification of a reusable lifting frame.
- Pressure Testing and Factory Acceptance Testing.
- Site Installation.
Using Offsite Manufacturing principals, early engagement and collaboration, transport restrictions were considered well in advance.
This project has highlighted the benefits of early engagement, collaboration and factory thinking.
- Greater control of quality
- Decrease assembly times
- Decreased time on site
- Increased health & safety and environmental controls
- Reduced fabrication times through early design involvement